Tutorial

A guide to the tool, step by step

How a project is built: describe your port as it is today, create scenarios of what to electrify, then read and compare their results.

Workflow overview

Set up onceRepeat per scenario0Create1Port context2Baseline3Scenario4Results5Compare6CustomiseBaseline changesapply to all scenarios

Step-by-step guide

Create a project

Set up a new port project to organise your baseline and scenarios.

  1. aOpen Projects and press "+ New project"
  2. bName the project
  3. cPick the port by name or UN/LOCODE
  4. dYour project, with its terminals and scenarios

Tip Choose your personal workspace or your company. Name and location can be refined later in Port context.

Set up the port context

Define your entity type and electricity setup before configuring the baseline.

  1. aCheck name and location
  2. bChoose your entity type
  3. cAdd your electricity cost (excl. VAT) and grid factor
  4. dOPS and DC business cases

Tip Without port-specific electricity data, global averages are used. Port-specific data is strongly recommended.

Configure the port baseline

Define your current port setup — terminals, berths, equipment, and vessel traffic.

  1. aTerminals and their berths
  2. bEquipment: diesel and electric
  3. cVessel calls and berth hours
  4. dTugs and pilot boats, port-wide

Tip Saved automatically. Once you have scenarios, baseline changes apply to all of them.

Define an electrification scenario

Choose what to electrify — equipment, shore power berths, and charging infrastructure.

  1. aConvert diesel units
  2. bAdd new electric units
  3. cTurn on shore power (OPS) per berth
  4. dElectrify tugs and pilot boats
  5. eChargers: how they charge, and counts (optional)

Tip Build several scenarios, for example full electrification and shore power only.

See the results

The port engine computes CAPEX, OPEX, and CO₂eq savings for your scenario.

  1. aOpen Results: it calculates every scenario on its own
  2. bCO₂eq change against the baseline
  3. cTotal CAPEX, as a Class 5 range
  4. dAnnual OPEX savings
  5. eBaseline against scenario, a year

Tip Whenever Results or Compare opens after a change, every scenario in the project is recalculated and the results are saved. Each section (Emissions, Investment, Operating costs, Energy & grid, Terminals) explains its figures; "Share results" at the top of the project gives a read-only link.

Compare scenarios

View side-by-side metrics to identify the most cost-effective electrification pathway.

  1. aPick up to 4 scenarios with results
  2. bCAPEX ranges and OPEX side by side
  3. cCO₂eq, with the change against today
  4. dCompare in detail below, including investment against results

Tip Compare brings every scenario up to date as it opens, so each one with something to calculate can be picked. "Best" marks the strongest scenario for each figure.

Customise assumptions

Override default economic, equipment, or grid parameters for sensitivity analysis.

  1. aOpen "Project assumptions"
  2. bClick a value to change it
  3. cBlue = your value, "(was …)" the default
  4. dOne set for the whole project

Tip The reset icon brings a row back to its default, so you can try a figure and undo it at any time. Changes are saved as soon as you leave a cell; the results are recalculated once the pop-up is closed and Results or Compare is open.