Guides to Zero · Tool
Port electrification, scenario by scenario
Model what electrifying your port’s equipment, shore power and service boats would cost, save and cut in emissions, and compare the scenarios before you talk to your grid operator or your board.
OdySea Port
From diesel to the grid: model what electrifying your port costs, what it saves and how much it cuts emissions, terminal by terminal.
A planning tool for port authorities and terminal operators
OdySea Port estimates the investment, operating costs and CO₂eq savings of electrifying a port: from converting a single piece of terminal equipment to shore power for calling vessels and the grid connection the whole port needs.
You describe your port as it is today, then build scenarios of what to electrify. The tool compares each scenario with today, so you can see what changes and why before you talk to suppliers, your grid operator or your board.
The rules are set. The dates are close.
EU regulation now requires shore power at major ports and its use by the ships that call there.
FuelEU Maritime applies: limits on the greenhouse gas intensity of the energy used by ships above 5,000 GT calling at EU and EEA ports.
Regulation (EU) 2023/1805
2025
By the end of 2029, TEN-T ports above set traffic thresholds must provide shore power for container and passenger ships.
AFIR, Regulation (EU) 2023/1804
2029
Container and passenger ships at berth for more than two hours in those ports must connect to shore power, with a penalty for each call made without it.
FuelEU Maritime, Article 6
2030
The reduction in greenhouse gas intensity ships must reach by 2050, against the 2020 reference of 91.16 gCO₂eq/MJ.
FuelEU Maritime, Article 4
−80%
Why electrify a port
Costs are moving
Lithium-ion battery pack prices have fallen by more than 90% since 2010. Electricity costs less than diesel per unit of useful work, and electric machines have fewer parts to maintain. Carbon pricing, such as the EU Emissions Trading System, raises the cost of burning fuel.
Battery prices: BloombergNEF
Equipment is ready
Electric options exist for nearly every kind of terminal equipment: ship-to-shore cranes are already mostly electric, and battery-electric yard tractors, reach stackers and straddle carriers are in commercial service. The grid connection built for shore power can also serve terminal equipment.
Cleaner air near the port
Diesel equipment and ships’ engines at berth emit nitrogen oxides, sulfur dioxide and fine particles. Studies associate living near port activity with higher rates of respiratory and cardiovascular disease. Shore power lets ships switch their engines off while they are alongside.
What the tool covers
Container, cruise, RoRo, multi-purpose and dry bulk terminals, one port at a time.
Terminal equipment
Cranes, yard tractors, reach stackers, straddle carriers, reefer gensets: replace diesel units with electric ones, with the chargers they need.
Shore power and DC charging
Shore power (OPS) per berth, sized to the IEC 80005 standards, and DC charging for battery-electric vessels.
Port service boats
Tugs and pilot boats: convert diesel boats or add electric ones, with a dedicated charger for each.
Grid infrastructure
The peak demand of everything you electrify, and the substations and cables it calls for, before you approach your grid operator.
How it works
Port context
Who you are, the emissions boundary you report on, your electricity price and grid emission factor, fuels and business cases.
Baseline
Your terminals today: berths, vessel calls, throughput and the diesel equipment you run, plus tugs and pilot boats.
Scenarios
What you electrify: equipment to replace or add, shore power and DC charging per berth, electric boats.
Results
Investment with its range, operating costs and savings, simple payback, energy and grid peak, CO₂eq by scope.
Compare
Up to four scenarios side by side, each against your port today.
What you get
- Investment
- CAPEX by component, with a −30% / +50% estimate range
- Operating costs
- Annual OPEX and savings against today, and the simple payback
- Energy and grid
- Fuel avoided, electricity used and the peak power to plan for
- Emissions
- CO₂eq by scope 1, 2 and 3, Well-to-Wake or Tank-to-Wake
How you work with it
- On your own
- Projects in a personal workspace that only you can see
- With colleagues
- A company workspace, with projects shared with the colleagues you choose
- With your own values
- Every default assumption can be replaced with your port’s figures
- Sharing results
- A read-only link to the results, without access to your inputs
Go deeper
Model your port
Start a project, describe your port as it is today, and build your first scenario.
Disclaimer
OdySea Port (the “Tool”) is provided by Fonden Mærsk Mc-Kinney Møller Center for Zero Carbon Shipping (the “Center”) for informational, planning and analytical purposes only. The Tool generates indicative estimates based on reference data, modelling assumptions and information provided or selected by users. The Center does not guarantee the accuracy, completeness, reliability or suitability of the Tool or its results for any particular purpose. Actual costs, electricity consumption, emissions reductions and operational outcomes may differ materially from the estimates generated. The results do not constitute forecasts, recommendations or technical, engineering, financial, investment, regulatory or legal advice. Users must independently assess and validate the results and obtain appropriate professional advice before making investment or operational decisions.
The Tool is for illustrative purposes only and must not be used for exchange of commercially sensitive information with competitors or to coordinate pricing, costs, investment decisions, capacity, commercial strategies or other competitive conduct. Users are responsible for ensuring compliance with applicable competition laws.
Questions or feedback? Contact us